Opened 18 years ago
Closed 18 years ago
#64 closed Defect (fixed)
sometimes only one wu running on hyperthreading cpu
Reported by: | KSMarksPsych | Owned by: | davea |
---|---|---|---|
Priority: | Major | Milestone: | Undetermined |
Component: | Client - Daemon | Version: | |
Keywords: | Cc: |
Description
Posted by: Date: 4:11 PM 04-09-2006 I have a P4 3.2Ghz Ht processor running windows XP. (hyper threading enabled) I have noticed that although I should be running 2 wu's all the time that sometimes when switching projects only 1 wu will be getting processed then at the next switch it will run 2 again. I am using v5.3.31 but I have noticed the same problem on all the earlier versions that I have run as well
Posted by: Date: 9:33 AM 04-12-2006 This only happened to me (5.2.13) if two results are finished at the same time and uploading. The only thing what you can do is to suspend one WU and resume again or update project manually.
Posted by: Date: 2:50 AM 07-23-2006 It happens on dual (physical) CPU systems too, usually in projects with very short running WUs, as those more likely end synchronous (CC 5.1.12)
Fixed