Changes between Version 36 and Version 37 of ProjectOptions
- Timestamp:
- Sep 2, 2007, 2:05:05 PM (18 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
ProjectOptions
v36 v37 41 41 Maximum results sent per scheduler RPC. Helps prevent hosts with trouble from getting too many results and trashing them. But you should set this large enough so that a host which is only connected to the net at intervals has enough work to keep it occupied in between connections. 42 42 '''max_wus_in_progress''':: 43 Maximum results in progress per host. Setting this to something (like 2 for instance) will limit the number of results a given host can simultaneously have registered as 'in progress'. You will need to also use 'resend_lost_results' to avoid blocking the host from getting new work if it ever loses track of any its workunits. 43 Maximum results in progress per host. Setting this to something (like 2 for instance) will limit the number of results a given host can simultaneously have registered as 'in progress'. 44 {{{ 45 #!html 46 <!-- You will need to also use 'resend_lost_results' to avoid blocking the host from getting new work if it ever loses track of any its workunits. - Fixed in 13101? --> 47 }}} 44 48 '''min_sendwork_interval''':: 45 49 Minimum number of seconds to wait after sending results to a given host, before new results are sent to the same host. Helps prevent hosts with download or application problems from trashing lots of results by returning lots of error results. But don't set it to be so long that a host goes idle after completing its work, before getting new work.