Changes between Version 18 and Version 19 of OrgGrid


Ignore:
Timestamp:
Jul 15, 2008, 11:36:52 AM (16 years ago)
Author:
teleyinex
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • OrgGrid

    v18 v19  
    77OGM is focused in harnessing a set of BOINC enabled PCs resources from one institution (see the above image). The basic working model will be that a committee will decide which BOINC projects are interesting for the institution. Based on this decision, the institution will donate its BOINC enabled PCs to the chosen projects.
    88
    9 The OGM distinguish between the following "hardware" elements:
    10  * PC. This is the basic item of OGM. A PC here is named as a "BOINC working node".
    11  * Pool. A Pool is a set of zero or more PCs that share something in common. For example, all the PCs are located in the same laboratory.
    12  * Department. A Department is a set of one or more Pools of computers that share something in common. For example, all the pools belongs to the math research group of the institution.
     9For OGM, from the point of view of hardware components, an institution is composed with the following items:
     10 * PC. This is the basic item of OGM. A PC here is named as a "BOINC working node". The institution must have at least one PC.
     11 * Pool. A Pool is a set of zero or more PCs that share something in common. For example, all the PCs are located in the same laboratory. The institution must have at least one pool of computers.
     12 * Department. A Department is a set of one or more Pools of computers that share something in common. For example, all the pools belongs to the math research group of the institution. An institution must have at least one Department.
     13
     14For OGM, from the point of view of managers, an institution is composed with the following persons:
     15 * IT Manager. An IT Manager always belongs to one Department. For this reason, the IT Manager can only administer the computer pools which belongs to his department.
     16 * Project Manager. A Project Manager is in charge of choosing the BOINC projects that will run on the institution BOINC PCs.
    1317
    1418