Changes between Version 8 and Version 9 of JobSizeMatching


Ignore:
Timestamp:
Apr 19, 2013, 1:18:15 PM (12 years ago)
Author:
davea
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • JobSizeMatching

    v8 v9  
    9393
    9494Notes:
     95 * My intent is to have this become the default scheduling mechanism,
     96   replacing the current array-scan and score-based mechanisms.
    9597 * The scan size N is configurable.
    9698  E.g. WCG plans to have a job array of 3-4000, and N = ~500.