Changes between Version 3 and Version 4 of CreditProposal


Ignore:
Timestamp:
Jan 9, 2008, 2:41:57 PM (16 years ago)
Author:
davea
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • CreditProposal

    v3 v4  
    5454 * Suppose a project's application needs X GB of RAM, and there is only one host in the BOINC population with that much RAM.  Then its credit per day for that host can be 100N, where N is the size of the population.  In other words, that computer can get as much credit as all other computers combined.  Is this desirable?
    5555 * The accounting rule doesn't take into account non-competing projects.  E.g. suppose project A uses only CPU and project B uses only disk.  If hosts attach to both projects with equal resource shares, the projects will be limited to issuing 50 credits/day on the average.
    56  * Suppose a project uses a resource that no other project wants (e.g. QCN uses the accelerometer found in some laptops).  Should the project be able to allocate the full 100 credits/day on average?
     56 * Suppose a project uses a resource that other projects use little or none of (e.g. QCN uses the accelerometer found in some laptops; Depspid uses network).  How much credit should the project be allowed to grant?  Under the current proposal, they would be allowed to grant something like 100/(N+1) per host/day, where N is the average number of other attached projects.
    5757 * This proposal doesn't say anything about the last 3 types of utility.