  • ClientSchedOctTen

    v7 v8  
    132132   is initiated whenever the saturated period is less than min.
    133133 * ask the fetchable project with greatest SP(P) for "shortfall" seconds of work.
     134 * option: if not at max after this RPC, try the project with 2nd-highest SP(), etc.
    134135 * whenever a scheduler RPC to project P is done
    135136   (e.g. to report results)